Alabama
    Environmental

    Alabama Stormwater Discharge (NPDES) Permit

    The NPDES Stormwater Discharge Permit is a regulatory requirement for construction activities or industrial facilities that discharge stormwater into surface waters. It ensures that businesses and developers implement measures to prevent pollution from runoff entering Alabama's waterways.

    iContract is an independent guide, not a government agency. Explanatory text is not confirmation of a form’s applicability. Check the agency’s current version and instructions before filing.

    Who needs it

    This permit is required for entities engaged in land-disturbing activities that exceed specific size thresholds or industrial facilities covered under federal regulations. It is essential for those who want to operate legally while minimizing environmental impact.

    How to submit

    Online

    https://adem.alabama.gov/programs/water/waterforms.cnt

    By mail

    ADEM, Water Division, P.O. Box 301463, Montgomery, AL 36130-1463

    In person

    ADEM Central Office, 1400 Coliseum Blvd, Montgomery, AL 36110

    By email

    watermail@adem.alabama.gov

    Deadline

    At least 30 days prior to the commencement of land-disturbing activities.

    People also ask

    What is NPDES?

    NPDES stands for the National Pollutant Discharge Elimination System, a federal program designed to control water pollution by regulating point sources that discharge pollutants into waters of the United States.

    How much does the application cost?

    The application fee varies based on the type of permit and the nature of the project; applicants should check the ADEM fee schedule on the agency website.

    Do I need a Notice of Intent (NOI)?

    Yes, for general permit coverage, applicants must typically submit a Notice of Intent form alongside the application requirements.

    Signature, notarization & use abroad

    For environmental documents, read the specific form’s signature instructions. Do not assume a witness, notary or certified copy is required from the category alone. Check with the issuing agency before signing.

    For use outside the United States, ask the receiving authority what authentication it requires for this document. Requirements vary by document and destination.

    Explore Alabama agency sources

    Explore related resources

    Need a contract that pairs with this?

    Prepare a guided agreement with your own facts. Review the wording and obtain legal advice when your situation requires it.

    Start drafting

    iContract provides plain-English guides only. Confirm the current form version, fees, and deadlines on the official Alabama Department of Environmental Management website before filing.