Arkansas
    Environmental

    Arkansas Stormwater Discharge (NPDES) Permit

    The Stormwater Discharge NPDES permit is a regulatory requirement for facilities and construction sites to discharge stormwater into state waters. It outlines necessary measures to prevent pollution from runoff and requires the submission of a Stormwater Pollution Prevention Plan (SWPPP).

    iContract is an independent guide, not a government agency. Explanatory text is not confirmation of a form’s applicability. Check the agency’s current version and instructions before filing.

    Who needs it

    Any individual or business engaged in construction activities that disturb one or more acres of land needs this permit. It is also required for certain industrial facilities identified by federal and state regulations.

    How to submit

    Online

    https://eportal.adeq.state.ar.us/

    By mail

    5301 Northshore Drive, North Little Rock, AR 72118

    By email

    water-permit-application@adeq.state.ar.us

    Deadline

    At least 30 days prior to the commencement of construction or industrial operations.

    People also ask

    What is a SWPPP?

    A Stormwater Pollution Prevention Plan (SWPPP) is a site-specific document that identifies potential sources of stormwater pollution and describes the controls to minimize or eliminate such pollution.

    How much does the permit cost?

    The permit fee varies based on the type of activity and the scale of the project; consult the DEQ fee schedule available on their website.

    Does the permit expire?

    Yes, NPDES permits are typically issued for a five-year term and must be renewed before expiration if the activity continues.

    Signature, notarization & use abroad

    For environmental documents, read the specific form’s signature instructions. Do not assume a witness, notary or certified copy is required from the category alone. Check with the issuing agency before signing.

    For use outside the United States, ask the receiving authority what authentication it requires for this document. Requirements vary by document and destination.

    Explore Arkansas agency sources

    Explore related resources

    Need a contract that pairs with this?

    Prepare a guided agreement with your own facts. Review the wording and obtain legal advice when your situation requires it.

    Start drafting

    iContract provides plain-English guides only. Confirm the current form version, fees, and deadlines on the official Arkansas Department of Energy and Environment - Division of Environmental Quality (DEQ) website before filing.