Delaware
    Environmental

    Delaware Septic System Permit

    This permit is required for the construction, installation, or modification of an On-Site Wastewater Treatment and Disposal System (septic system). It ensures the system meets environmental and public health standards to prevent contamination of groundwater.

    iContract is an independent guide, not a government agency. Explanatory text is not confirmation of a form’s applicability. Check the agency’s current version and instructions before filing.

    Who needs it

    Property owners or their authorized contractors who are installing a new septic system or repairing an existing one. It is required for any residential or commercial project that relies on a non-public sewer solution.

    How to submit

    Online

    https://dnrec.alpha.delaware.gov/water-discharges/septic/permit-application/

    By mail

    Groundwater Discharges Section, 89 Kings Highway, Dover, DE 19901

    In person

    DNREC Groundwater Discharges Section office in Dover

    By email

    DNREC_SepticHelp@delaware.gov

    People also ask

    Do I need a professional engineer to design my system?

    Yes, for most septic system installations, a DNREC-licensed Class D site evaluator and a Class C system designer are required to submit the design.

    How long does the permit process take?

    Processing times vary based on the complexity of the site and the volume of applications, but typically range from several weeks to months.

    Signature, notarization & use abroad

    For environmental documents, read the specific form’s signature instructions. Do not assume a witness, notary or certified copy is required from the category alone. Check with the issuing agency before signing.

    For use outside the United States, ask the receiving authority what authentication it requires for this document. Requirements vary by document and destination.

    Explore Delaware agency sources

    Explore related resources

    Need a contract that pairs with this?

    Prepare a guided agreement with your own facts. Review the wording and obtain legal advice when your situation requires it.

    Start drafting

    iContract provides plain-English guides only. Confirm the current form version, fees, and deadlines on the official Delaware Department of Natural Resources and Environmental Control (DNREC) website before filing.