Massachusetts
    Environmental

    Massachusetts Stormwater Discharge (NPDES) Permit

    This permit is required for construction activities that disturb one or more acres of land. It regulates the discharge of stormwater runoff into the waters of the United States to prevent pollution and protect water quality.

    iContract is an independent guide, not a government agency. Explanatory text is not confirmation of a form’s applicability. Check the agency’s current version and instructions before filing.

    Who needs it

    Operators of construction sites that disturb one or more acres of land are required to obtain coverage. This includes owners, developers, and general contractors responsible for the site.

    How to submit

    Online

    https://npdes-ereporting.epa.gov/net-cgp

    Deadline

    At least 14 days prior to commencing earth-disturbing activities.

    People also ask

    Is a state-level permit required in addition to the EPA permit?

    Massachusetts is not authorized to administer the NPDES program, so most construction operators must obtain coverage under the EPA's Construction General Permit.

    How do I determine if my site disturbs one acre or more?

    You must calculate the total area of land-disturbing activities including clearing, grading, and excavation associated with the project.

    Signature, notarization & use abroad

    For environmental documents, read the specific form’s signature instructions. Do not assume a witness, notary or certified copy is required from the category alone. Check with the issuing agency before signing.

    For use outside the United States, ask the receiving authority what authentication it requires for this document. Requirements vary by document and destination.

    Explore Massachusetts agency sources

    Explore related resources

    Need a contract that pairs with this?

    Prepare a guided agreement with your own facts. Review the wording and obtain legal advice when your situation requires it.

    Start drafting

    iContract provides plain-English guides only. Confirm the current form version, fees, and deadlines on the official Environmental Protection Agency (EPA) Region 1 website before filing.