Ohio
    Environmental

    Ohio Stormwater Discharge (NPDES) Permit

    This permit is required for entities that discharge stormwater from construction activities or industrial facilities into Ohio's waters. It establishes legal limits and monitoring requirements to ensure compliance with the Clean Water Act.

    iContract is an independent guide, not a government agency. Explanatory text is not confirmation of a form’s applicability. Check the agency’s current version and instructions before filing.

    Who needs it

    Operators of construction sites that disturb one or more acres of land must obtain coverage. Industrial facilities categorized by specific Standard Industrial Classification (SIC) codes are also required to apply.

    How to submit

    Online

    https://ebiz.epa.ohio.gov/

    By mail

    Ohio EPA, Division of Surface Water, P.O. Box 1049, Columbus, OH 43216-1049

    Deadline

    Applications must be submitted at least 45 days prior to the start of construction activities.

    People also ask

    What is the primary way to apply?

    The Ohio EPA encourages applicants to use the eBusiness Center portal for electronic submission of Notice of Intent (NOI) forms.

    Do I need a permit for a small residential project?

    Only if your project disturbs one or more acres of land or is part of a larger common plan of development that meets the threshold.

    Signature, notarization & use abroad

    For environmental documents, read the specific form’s signature instructions. Do not assume a witness, notary or certified copy is required from the category alone. Check with the issuing agency before signing.

    For use outside the United States, ask the receiving authority what authentication it requires for this document. Requirements vary by document and destination.

    Explore Ohio agency sources

    Explore related resources

    Need a contract that pairs with this?

    Prepare a guided agreement with your own facts. Review the wording and obtain legal advice when your situation requires it.

    Start drafting

    iContract provides plain-English guides only. Confirm the current form version, fees, and deadlines on the official Ohio Environmental Protection Agency (Ohio EPA) website before filing.