Oklahoma Stormwater Discharge (NPDES) Permit
The Stormwater Discharge Permit, issued under the Oklahoma Pollutant Discharge Elimination System (OPDES), authorizes and regulates discharges of stormwater runoff into Oklahoma waterbodies. It requires operators to implement erosion controls and stormwater management practices to safeguard water quality. Coverage is typically secured by developing a Stormwater Pollution Prevention Plan (SWPPP) and submitting a Notice of Intent (NOI).
iContract is an independent guide, not a government agency. Explanatory text is not confirmation of a form’s applicability. Check the agency’s current version and instructions before filing.
Who needs it
Operators of construction projects disturbing one or more acres of land, or smaller sites that are part of a larger common plan of development, must obtain this permit. It is also required for industrial facilities with stormwater discharges associated with specific industrial categories regulated by the state.
How to submit
Submitted through the ODEQ electronic permitting and reporting portal.
Oklahoma Department of Environmental Quality, Water Quality Division, P.O. Box 1677, Oklahoma City, OK 73101-1677
Oklahoma Department of Environmental Quality, 707 N Robinson Ave, Oklahoma City, OK 73102
Deadline
The Notice of Intent (NOI) must be submitted at least 14 calendar days before commencing construction or operational activities.
People also ask
What is a Stormwater Pollution Prevention Plan (SWPPP)?
A SWPPP is a site-specific document detailing potential pollution sources and identifying the best management practices (BMPs) used to prevent pollutants from entering stormwater runoff.
How long is stormwater permit coverage valid?
General permit coverage typically remains valid throughout the life of the project or until the general permit expires, provided required annual fees and compliance reports are maintained.
How is permit coverage terminated once work is complete?
Operators must submit a Notice of Termination (NOT) after all earth-disturbing activities are complete and the site has achieved final stabilization.
Are there fees associated with the stormwater permit?
Yes, the ODEQ requires an initial application fee upon submission of the Notice of Intent as well as an annual permit fee.
Signature, notarization & use abroad
For environmental documents, read the specific form’s signature instructions. Do not assume a witness, notary or certified copy is required from the category alone. Check with the issuing agency before signing.
For use outside the United States, ask the receiving authority what authentication it requires for this document. Requirements vary by document and destination.
Explore Oklahoma agency sourcesExplore related resources
Oklahoma agency directory
Every Oklahoma agency you might need — SoS, DMV, courts, tax, licensing.
All Oklahoma state forms
Browse the full plain-English catalog for Oklahoma.
Fill an official PDF online
Type into the form, save a draft and download or send it for signature.
Legal reference library
Standard clauses, 50-state tables and landmark contract cases.
Talk to a licensed professional
Explore professional resources for situations that need individual advice.
Need a contract that pairs with this?
Prepare a guided agreement with your own facts. Review the wording and obtain legal advice when your situation requires it.
Start draftingiContract provides plain-English guides only. Confirm the current form version, fees, and deadlines on the official Oklahoma Department of Environmental Quality (ODEQ) website before filing.