Texas
    Environmental

    Texas Stormwater Discharge (NPDES) Permit

    The Stormwater Discharge Permit is a regulatory requirement for industrial facilities that discharge stormwater into surface waters in Texas. It ensures that businesses manage their runoff to minimize pollutants and protect water quality throughout the state.

    iContract is an independent guide, not a government agency. Explanatory text is not confirmation of a form’s applicability. Check the agency’s current version and instructions before filing.

    Who needs it

    Operators of industrial facilities that fall under specific categories defined by the EPA and TCEQ must obtain this permit. This applies to businesses whose activities involve materials, equipment, or products exposed to precipitation.

    How to submit

    Online

    https://www3.tceq.texas.gov/steers/

    By mail

    TCEQ, Water Quality Division, MC-148, P.O. Box 13087, Austin, TX 78711-3087

    Deadline

    Applications must be submitted before operations begin, typically at least 48 hours before the start of discharge.

    People also ask

    What system is used for online submission?

    TCEQ uses the STEERS (State of Texas Environmental Electronic Reporting System) portal for electronic submissions.

    Does every industrial facility need this permit?

    Only specific industrial sectors defined by Standard Industrial Classification (SIC) codes are required to obtain coverage under the TPDES Stormwater General Permit.

    Is there a fee associated with this permit?

    Yes, there is an application fee required for processing, which can be paid through the STEERS system.

    Signature, notarization & use abroad

    For environmental documents, read the specific form’s signature instructions. Do not assume a witness, notary or certified copy is required from the category alone. Check with the issuing agency before signing.

    For use outside the United States, ask the receiving authority what authentication it requires for this document. Requirements vary by document and destination.

    Explore Texas agency sources

    Explore related resources

    Need a contract that pairs with this?

    Prepare a guided agreement with your own facts. Review the wording and obtain legal advice when your situation requires it.

    Start drafting

    iContract provides plain-English guides only. Confirm the current form version, fees, and deadlines on the official Texas Commission on Environmental Quality (TCEQ) website before filing.