Utah Stormwater Discharge (NPDES) Permit
This permit is required for construction activities that disturb one or more acres of land. It authorizes the discharge of stormwater from construction sites into waters of the state under the Utah Pollutant Discharge Elimination System (UPDES).
iContract is an independent guide, not a government agency. Explanatory text is not confirmation of a form’s applicability. Check the agency’s current version and instructions before filing.
Who needs it
Any owner or operator of a construction project that results in the disturbance of one or more acres of total land area. This includes smaller projects that are part of a larger common plan of development or sale.
How to submit
https://deq.utah.gov/water-quality/updes-stormwater-construction-permits
Utah Division of Water Quality, P.O. Box 144870, Salt Lake City, UT 84114-4870
wqinfo@utah.gov
Deadline
At least 30 days prior to the commencement of construction activities.
People also ask
What is the CGP?
The CGP is the Construction General Permit that covers stormwater discharges from construction sites.
Do I need a permit for a project smaller than one acre?
Generally no, unless your project is part of a larger common plan of development that equals or exceeds one acre.
Signature, notarization & use abroad
For environmental documents, read the specific form’s signature instructions. Do not assume a witness, notary or certified copy is required from the category alone. Check with the issuing agency before signing.
For use outside the United States, ask the receiving authority what authentication it requires for this document. Requirements vary by document and destination.
Explore Utah agency sourcesExplore related resources
Utah agency directory
Every Utah agency you might need — SoS, DMV, courts, tax, licensing.
All Utah state forms
Browse the full plain-English catalog for Utah.
Fill an official PDF online
Type into the form, save a draft and download or send it for signature.
Legal reference library
Standard clauses, 50-state tables and landmark contract cases.
Talk to a licensed professional
Explore professional resources for situations that need individual advice.
Need a contract that pairs with this?
Prepare a guided agreement with your own facts. Review the wording and obtain legal advice when your situation requires it.
Start draftingiContract provides plain-English guides only. Confirm the current form version, fees, and deadlines on the official Utah Division of Water Quality website before filing.