Washington
    Environmental

    Washington Stormwater Discharge (NPDES) Permit

    The NPDES Stormwater Discharge permit is a regulatory requirement for facilities or construction sites that discharge stormwater into surface waters of the state. It ensures that pollutants are managed to protect water quality under the federal Clean Water Act.

    iContract is an independent guide, not a government agency. Explanatory text is not confirmation of a form’s applicability. Check the agency’s current version and instructions before filing.

    Who needs it

    Construction sites that disturb one or more acres of land and certain industrial facilities are required to obtain this permit. You must apply if your operations result in a point source discharge of stormwater into state waters.

    How to submit

    Online

    https://ecology.wa.gov/Regulations-Permits/Permits-certifications/Stormwater-general-permits/Construction-stormwater-permit

    By mail

    Washington State Department of Ecology, Water Quality Program, PO Box 47696, Olympia, WA 98504-7696

    Deadline

    Applications must be submitted at least 60 days prior to the planned commencement of a discharge.

    People also ask

    Do I need a permit for a small construction project?

    Generally, if your project disturbs less than one acre of land and is not part of a larger common plan of development, you may not require this specific permit.

    How long does it take to get coverage?

    Once a complete application is submitted and the public notice period has concluded, the Department of Ecology typically issues coverage within 30 to 60 days.

    Signature, notarization & use abroad

    For environmental documents, read the specific form’s signature instructions. Do not assume a witness, notary or certified copy is required from the category alone. Check with the issuing agency before signing.

    For use outside the United States, ask the receiving authority what authentication it requires for this document. Requirements vary by document and destination.

    Explore Washington agency sources

    Explore related resources

    Need a contract that pairs with this?

    Prepare a guided agreement with your own facts. Review the wording and obtain legal advice when your situation requires it.

    Start drafting

    iContract provides plain-English guides only. Confirm the current form version, fees, and deadlines on the official Washington State Department of Ecology website before filing.